
The following table contains deliverables/outputs for each of the components of service that can be provided by InterHealth Saudi Arabia. It includes pre-operating activities, in addition to the operations and management of any health-related projects.
| Service Offering | Key Outputs and Deliverables | 
| Feasibility study and Financial Model | ·      Review or develop where information is unavailable/insufficient
 · Review the financial plan · Review the operational plan · Develop the Financial Model  | 
| Functional Programming Review and Development | ·      Recommended key areas of clinical specialties, department sizes and support services
 · Clinical services plan · Clinical Functional Design Review · Clinical Services Phasing Plan · Clinical Risks Review · Compliance with healthcare standards · Review of summary Medical Equipment Bill of Quantity (BoQ) for clinical and non-clinical equipment · Review of medical equipment placement working with the architects  | 
| Medical Equipment Planning (including supplies and consumables) | ·      Medical Equipment Plan
 · Equipment list including supplies and consumables · Review of fully loaded design drawings that show placement of equipment · Medical Equipment Phasing Plan · Medical Equipment Installation and Training Plan overview (to be revised during the commissioning phase).  | 
| Health Informatics & Information Technology Strategy | ·      Health Informatics & IT Strategy
 · Business capability document which includes high-level target operating model · High-level capacity plan · Performance dashboard requirements for all Health Informatics & IT · Functional and non-functional requirements · Project start-up documentation including OBC, Project Approach and Project Brief  | 
| Recruitment Strategy / HR Planning | ·      Provision of corporate structure
 · Provisional staffing pricing · Orientation Plan · Training Plan  | 
| Healthcare Planning during Construction | All on an as needed basis:
 · Project status reporting structure · Project quality controls · Risk and Issue logs · Workshops, reports  | 
| Recruitment Services/ Staff Pre-Opening Training and Orientation Oversight | ·      Recruitment per Manpower Plan
 · Complete scope and deliverables to be developed once the structure of hospital employment has been finalized.  | 
| Health Informatics and Information Technology Commissioning | ·      Health Informatics & IT Strategy Implementation
 · Implementation and refinement of the IT Strategy & Master Plan · Implementation and customization (where required) of the IT and HIS system · Integration with regulatory and billing networks where required  | 
| Operational Master Plan | ·      Agree on fundamental design principles of process flows and policies and procedures in line with the operating model;
 · Draft the process flows and clinical guidelines/ policies/procedures for each core business processes; · Leverage from our database of knowledge and draw upon relevant findings from other engagements of similar nature; and · Finalize the process flows and clinical guidelines/ policies/procedures with the relevant process owners. · Service based operating model; · Model of care; · Business process flows; · Clinical/ Patient Pathways; and · Guidelines/ policies / procedures  | 
| General Commissioning Activities | ·      Snag list in the facility are concluded or a plan is in place to conclude them;
 · Hospital is in a clean and safe environmental mode for the receipt of staff and patients; · All required insurance policies are in place; · PRO services are in place; · Recruitment and mobilization of staff is running smoothly; · Staff induction and orientation programs are in place; · Subcontracted services are in place; · Medical and non-medical equipment training programs underway; · Consumables and minimum order criteria in place; · Establish and implement financial systems and policies; · Departmental and administrative policies and procedures in place; · Dry runs implemented; · Ready for Go-Live Date  | 
There are many reasons to order cheap essays, and one reason is the insufficient time. The process of ordering essays is a fantastic method to reduce time and be more productive when in a stressful situation. Many services provide immediate help, and can write cover page for term paper an paper for you within 4 hours. Of course, the price depends on how long you need to finish the order. There is a chance to save quite a bit of money by waiting for a long time.